A bad earth is the fault that hides. Nothing stops working. No light comes on. The installation runs for years looking normal, and then a fault current that should have gone to ground goes somewhere else instead — through a metal casing, through a data cable, through a person. Fluke puts the consequence plainly: without a properly designed and maintained grounding system, fault currents will find unintended paths that could include people.

That is the safety half. The equipment half matters too, and it is the half that brings people to us. Surge protection has nowhere to send a spike without a good earth. Sensitive electronics read noise that was supposed to drain away. Fluke's own guidance notes that poor grounding is not only dangerous but increases the risk of equipment failure, and can cause instrumentation errors, harmonic distortion and intermittent faults. If you have replaced the same board twice and nobody can say why, the earth is worth measuring before the third one.

What earthing actually does

Two jobs, often confused.

It gives fault current a deliberate path. When a live conductor touches a metal casing, current must flow somewhere large enough and fast enough to make a protective device operate and disconnect the supply. If the path has high resistance, the current is small, the breaker does not trip, and the casing stays live.

It gives interference and surge energy somewhere to go. A surge protective device works by diverting a spike to earth. Lightning protection ends in an earth termination. Both are only as good as what they end in.

A third thing it does not do: earthing is not voltage correction. An installation can be perfectly earthed and still be fed 190V at eight in the evening. That is a different problem, handled by a different device, and it is covered in what is normal voltage in Ghana.

Five signs your earthing needs looking at

  1. A faint tingle from metal casings or taps. A fridge door, a cooker, a metal-cased desktop, a water heater. A tingle is leakage current finding you because it has no better route.
  2. Nuisance tripping with no identifiable fault. An RCD that trips in the rain, at a certain time of evening, or when one particular machine starts, usually points at leakage and earth path quality rather than at a bad appliance.
  3. The same equipment failing again and again in one place. One socket, one room or one machine eating boards while identical equipment elsewhere survives is a wiring and earthing pattern, not bad luck.
  4. Flickering or dimming that follows a heavy load. Lights that dip when the pump or the air conditioner starts can mean a poor connection in the supply or protective path, not just a weak supply.
  5. No earth electrode you can find, or one visibly corroded. No rod, no inspection pit, a rod sheared at ground level, or a green and crumbling clamp. If nobody can show you where the installation is earthed, assume it is not.

Any one of those is worth a measurement. Two together should not wait.

Why earths degrade, especially here

An earth electrode is a piece of metal in the ground, and the ground changes.

Soil moisture and season. Earth resistance depends on the soil around the electrode, and Ghanaian soil in late March is not the soil of late June. An installation measured once in the rainy season may read very differently in the dry. Any claim that an earth is good should carry the season it was measured in.

Corrosion. Fluke notes that corrosive soils with high moisture content, high salt content and high temperatures can degrade ground rods and their connections over time, and that resistance can rise even when the values at installation were low. Coastal Accra ticks all three boxes.

Mechanical damage and building work. Trenching, extensions, paving and new boreholes cut conductors and bury inspection points. Losing an earth during building work is extremely common and nobody notices, because nothing changes until a fault.

Theft and stripped conductors. Copper disappears. An earth conductor taken from an outdoor run leaves the installation exactly as unprotected as a cut one.

Installations that were never earthed properly. Some premises are simply wired without a usable earth, or with the earth bonded to a water pipe that has since been replaced in plastic. Ghana's Electrical Wiring Regulations are the legal framework here, and the Energy Commission has pressed the point for years: Graphic Business reported in April 2016 that the Commission had begun nationwide enforcement requiring certified professionals for electrical installations, under an instrument the paper refers to as LI 2008. Whether a given premises was ever inspected is a question worth asking before assuming it was.

What is actually measured, and what the numbers mean

A proper check is not a continuity buzz. It is a resistance measurement with a dedicated instrument, and there are two reference points worth knowing.

Fluke cites the United States National Electrical Code requirement that system impedance to ground is less than 25 ohms under NEC 250.56, and says that for facilities with sensitive equipment it should be 5.0 ohms or less. That is a US code figure, quoted as such — your installation is governed by Ghanaian practice and by the standards your installer works to, not by the NEC. But the shape of the guidance travels: an adequate earth for gross fault protection is not necessarily a good enough earth for sensitive electronics, and the number you need depends on what the earth is protecting.

For lightning protection, the bar is set differently again. The Furse guide to BS EN/IEC 62305 describes the standard's requirement as an overall resistance to earth path of 10 Ohms or less, and recommends a single integrated earth termination system combining lightning protection, power and telecommunication systems. If you are considering lightning protection, read it alongside lightning protection for appliances.

Two more things to ask for, in writing:

  • The season and conditions on the day of the measurement. A dry-season reading is the honest one to design against.
  • A repeat. Fluke's guidance is that all grounds and ground connections must be checked at least annually as part of routine maintenance, and that a 20% increase in resistance should be investigated. An earth is not a one-time installation item.

What a bad earth does to the protection you have already bought

This is the part that costs money quietly.

Surge protective devices. An SPD works by shunting a transient to earth. Give it a high-resistance path and the energy it diverts has nowhere good to go. The classification of these devices by install point is explained in surge protector, stabilizer or UPS, and all of it assumes a competent earth underneath.

Stabilizers and AVRs. A stabilizer corrects voltage. It does not create an earth, and a correctly stabilized supply into a badly earthed building still leaves metal casings unprotected in a fault.

UPS systems. A UPS filters and holds up the supply to its output. The protective earth passes through; it does not improve. A UPS in a building with no earth is protecting data, not people.

Solar and inverter installations. These add arrays, metal frames, long DC runs and roof-mounted equipment — more exposed metal and more surface area for induced surges. Bonding and earthing decisions become more important, not less, which is one reason hybrid and off-grid system choices should be made with the earthing arrangement on the table.

What to do about it

Do not test it with your hand. The tingle test is how people get hurt. Treat a tingling casing as a live casing and keep people away from it.

Do not DIY an earth rod. The arrangement of the earth and the neutral depends on how the supply is configured, and getting it wrong can defeat the protective devices you are relying on without anything appearing faulty. The same caution applies to changeover switches and transfer switches, where earthing and neutral arrangements are part of the installation decision.

Do ask for a measured report. Resistance value, instrument used, date, season, and what was found at the electrode and the main earth terminal.

Do fix it before buying more protection. Spending on surge protection or a UPS while the earth is unknown is spending on half a solution.

Frequently asked questions

What are the effects of poor earthing?

Shock risk from metal casings, protective devices that fail to operate in a fault, surge protection that cannot divert energy properly, nuisance tripping, equipment that fails repeatedly in one location, and electrical noise in sensitive instruments.

What causes poor earthing?

Electrode corrosion in hot, salty or wet soil, dry-season soil resistance, mechanical damage during building work, theft of copper conductors, loose or corroded clamps at the main earth terminal, and installations that were never provided with a proper earth.

Can I tell if my earthing is bad without a tester?

You can spot the signs — tingles, nuisance trips, repeated failures, a missing or corroded electrode. You cannot confirm the condition or know the value without a measurement, and a visual inspection that looks fine is not evidence of a good earth.

Does a UPS or stabilizer protect me if the earthing is bad?

Not in the way you want. Both deal with the quality of the supply. Neither replaces the protective earth, and the surge diversion inside them still relies on it.

How often should earthing be checked?

Treat it as annual maintenance alongside your other electrical checks, and re-measure after any building work, after any theft or damage to external conductors, and whenever new sensitive equipment is installed.

Have it measured before it proves itself

An earth either works on the day there is a fault or it does not, and the day there is a fault is a poor time to find out. A measurement takes very little time and settles the question.

Energy Links carries EAST, Inform and Siel UPS systems, Ortea AVRs and stabilizers and Power Star equipment, and our own engineers carry out site surveys, installation and after-sales servicing in Accra and across Ghana. Book a site survey through the contact page and we will look at the earthing arrangement as part of it, or browse the shop for the protection ranges we supply. Pricing depends on what the survey finds, so ask us directly rather than working from a figure.

Need help choosing the right equipment?

Our engineers will size it against your actual load, not a guess.

Talk to us