The quick method. Multiply the generator's output in kilowatts by about 0.25. That gives you roughly the litres of diesel per hour at full load.
So a set delivering 120 kW burns in the region of 30 litres an hour flat out. A set delivering 50 kW burns in the region of 12 to 13. Halve the load and you do not halve the fuel — you get something closer to 56 percent of it, because a lightly loaded diesel engine is a less efficient engine.
Three things that method will get wrong if you are not careful.
- Kilowatts, not kVA. Generators are sold in kVA. Fuel charts are published in kW. Using the kVA figure in a kW formula overstates your fuel burn by about 25 percent, and your tank and budget with it.
- Part load changes the rate per unit, not just the total. The penalty at low load is substantial and it is the single most expensive habit in Ghanaian generator ownership.
- Published figures are estimates. The ones we checked agree within roughly 10 percent of each other, which is good enough to plan with and not good enough to size a fuel contract on.
Here is the detail behind all three.
Step 1: get from kVA to kW, because this is where people go wrong
A generator's kVA rating is apparent power. Fuel is burned to produce real power, measured in kilowatts. The relationship is the power factor, and generator sets are conventionally rated at 0.8.
- A 150 kVA set multiplied by 0.8 is 120 kW
- A 100 kVA set is 80 kW
- A 60 kVA set is 48 kW
So when you look up a fuel consumption chart for your 150 kVA generator, you want the 120 kW row, not the 150 row. Reading the wrong row inflates the answer by a quarter. This is the most common arithmetic error in the subject, and it is the reason owners' real-world fuel figures often come in well under the number they were quoted.
The same kVA-to-kW conversion drives the sizing decision, which is worked through in what size generator do I need.
Step 2: the formula the charts come from
Fuel consumption is derived from the engine's specific fuel oil consumption, usually written SFOC and quoted in grams of fuel per kilowatt-hour of output.
Jubaili Bros, a generator distributor, publishes the derivation as:
Fuel (litres/hour) = (kW x SFOC) / (diesel density x 1000)
Taking an SFOC of 210 grams per kilowatt-hour and a diesel density of 0.85 kilograms per litre, that simplifies to roughly 0.247 multiplied by kW, which is where the 0.25 rule of thumb at the top of this post comes from.
The same source gives the realistic range for the SFOC input: modern generator sets around 200 to 215 grams per kilowatt-hour, with older engines potentially exceeding 230. At a density near 0.84 kilograms per litre that is roughly 0.24 to 0.26 litres per kilowatt-hour of electricity produced.
Note what that range implies. An older engine can burn appreciably more fuel for the same work than a new one, before any question of maintenance. If you are comparing a used set against a new one, the fuel difference belongs in the comparison.
Attribution matters here: this is a distributor's published method, not an engine manufacturer's test data. It is a sound and standard derivation, and it is not a substitute for the spec sheet of the specific model.
Step 3: the part-load penalty, which is the real story
Here is the figure set that should change how you operate a generator. The same distributor publishes SFOC against load:
- At 110 percent load: about 205 grams per kilowatt-hour
- At 100 percent: about 210
- At 75 percent: about 215
- At 50 percent: about 235
- At 25 percent: about 300
Read the last line again. At quarter load, the engine burns around 300 grams of fuel for every kilowatt-hour it produces, against 210 at full load. That is roughly 43 percent more fuel for every unit of electricity. The engine is still consuming fewer litres per hour overall — but each unit of electricity you get out of it costs dramatically more fuel.
The explanation given is the ordinary one and it is correct: fixed parasitic losses — oil pump, water pump, internal friction — stay roughly constant while useful output falls, so they consume a growing share of the fuel.
Worked through on that source's own 500 kVA, 400 kW example:
- 25 percent load, 100 kW: 35.3 litres per hour
- 50 percent load, 200 kW: 55.3 litres per hour
- 75 percent load, 300 kW: 75.9 litres per hour
- 100 percent load, 400 kW: 98.8 litres per hour
- 110 percent load, 440 kW: 106.2 litres per hour
One honest caveat about that source. It recommends operating at 70 to 80 percent load as the band delivering "the best fuel economy", while its own table shows a slightly lower SFOC at 100 and 110 percent than at 75 percent. Those two statements are not reconciled anywhere in the article. The sensible reading is that the 70 to 80 percent recommendation is about engine life, headroom for load steps and avoiding sustained overload, rather than about pure grams per kilowatt-hour — but we are flagging it rather than quietly picking whichever version suits. If a supplier quotes you an optimum load band, ask what it is optimising.
Step 4: cross-check against a second, independent source
One source is not evidence. Depco Power Systems, a US generator dealer, publishes an estimated diesel fuel consumption chart in US gallons per hour by generator size in kW, with the explicit warning that "This is only an estimate of fuel consumption".
For a 150 kW set it lists 3.6, 5.9, 8.4 and 10.9 gallons per hour at quarter, half, three-quarter and full load. Converted at 3.785 litres to the US gallon, that is approximately 13.6, 22.3, 31.8 and 41.3 litres per hour.
Now compare the two sources at the same operating points for a 150 kW output:
- Full load: the formula gives about 37 litres per hour; the chart gives about 41. A gap of roughly 11 percent.
- Half load: the formula gives about 21 litres per hour; the chart gives about 22. A gap of roughly 6 percent.
That is the honest answer to "how much fuel will my generator use". Two independent published sources, using different methods, land within about 10 percent of each other. Close enough to plan a tank, a refuelling round and an operating budget. Not close enough to treat as a specification.
What we could not get, and will not pretend to have. We tried to obtain a fuel consumption table directly from an engine or genset manufacturer — the kind printed on every proper spec sheet at 100, 75, 50 and 25 percent load. The manufacturer page we attempted refused automated access and the one candidate data sheet we retrieved was not machine-readable. So there is no original-equipment figure in this post, and we are telling you so rather than dressing up a dealer chart as one.
What to demand instead: the spec sheet for the exact model and rating you are being offered, with its fuel consumption table and the rating it applies to — standby, prime or continuous. Every serious manufacturer publishes it. A supplier who cannot produce it is quoting you an estimate, and you should price the uncertainty accordingly.
What this means in Ghanaian operation
The arithmetic above is universal. How it bites is local.
Light running is the default here, and it is the expensive case. A set bought with headroom for future growth, carrying an evening's lights, fridges and a few fans, may be running at 20 or 30 percent load for hours. That is the far-left end of the SFOC table — the most fuel per unit of electricity you will ever pay. It is also mechanically harmful: a diesel engine running at a small fraction of rated load does not reach proper combustion temperature, and the wet stacking, bore glazing and injector fouling that follow are covered in generator servicing schedule and what size generator do I need.
So the fuel question and the sizing question are the same question. Oversizing is not a harmless safety margin paid for once. It is a fuel penalty and a maintenance penalty paid every hour the set runs.
And it is the real argument for pairing rather than choosing. If your actual need is a modest evening load during outages, a generator running at a fifth of its rating is a poor way to supply it. An inverter with a battery bank carries small loads efficiently and silently, with the generator reserved for the loads and durations that genuinely need it. The comparison is in inverter or generator and UPS or inverter, and the battery runtime arithmetic is in how long a 200Ah battery lasts.
Two more local notes. Fuel quality and water in the fuel matter more in a humid climate than the charts assume, and heat and altitude derate the engine, which changes what percentage of rating a given load actually represents. Both are covered in the servicing and sizing posts above.
Frequently asked questions
How much diesel does a 150 kVA generator use per hour?
Convert first: 150 kVA at 0.8 power factor is 120 kW. At the 0.25 litres-per-kilowatt rule that is about 30 litres an hour at full load, and the published charts suggest something in the low thirties. At half load expect in the region of 17 to 19 litres an hour. Confirm against the spec sheet for the actual model — ours is listed as a 150 kVA generator and we will provide the data sheet on request.
How do I calculate fuel consumption for any size?
Take the kVA rating, multiply by 0.8 to get kW, then multiply by about 0.25 for litres per hour at full load. For part load, multiply the kW actually being produced by the litres-per-kilowatt-hour figure for that load point — roughly 0.25 at full load, 0.28 at half, and around 0.36 at quarter load.
Why is my actual consumption different from the chart?
Engine age and condition, air filter state, fuel quality, ambient temperature, altitude, and above all the load you are really carrying rather than the load you assume. Measuring consumption over a week of normal operation tells you more than any chart.
How big should my fuel tank be?
Work from litres per hour at your realistic load, multiplied by the hours you need to run between refuelling, plus a reserve. Do the calculation at your real load, not at full load, or you will carry a tank you never use.
What does it cost per hour to run?
That depends on the current diesel price, which moves. Work out your litres per hour from this post, and contact us if you want help building a running-cost comparison against an inverter or solar option for your site.
Get the figures from the real spec sheet
Fuel is the largest part of what a generator costs you over its life, and it is decided by two things you control: the size you buy and the load you run it at. Both are decisions worth getting right before purchase rather than discovering afterwards.
Our engineers will build an honest load list, size the set to it rather than to a round number, provide the manufacturer's fuel consumption table for the model quoted, and tell you plainly where a generator is the right answer and where a battery system would carry the load for less.
Contact us for a site survey, or browse the generators and power equipment we stock.
Need help choosing the right equipment?
Our engineers will size it against your actual load, not a guess.
Talk to us